Skip to Content

ZATCA Phase 2 e-invoicing in Odoo

Wave 25 brings businesses whose VAT-taxable revenue exceeded SAR 187,500 in any year from 2022 to 2025 into Phase 2. The integration deadline is 1 February 2027. We connect your Odoo to ZATCA's Fatoora platform, test it and take you live.

Check if you're in Wave 25

ZATCA Phase 2 e-invoicing in Odoo

What Phase 2 means

Invoices go through ZATCA

Each tax invoice is cleared or reported to the Fatoora platform as you issue it.

Structured invoices

Invoices are generated in ZATCA's XML format with a QR code and a cryptographic stamp.

A registered system

Your Odoo is onboarded to ZATCA with its own certificate (CSID) before it can send invoices.

How we take you live

1

Check your setup

We review your Odoo version, edition and Saudi settings.

2

Configure

Company, VAT and Saudi localization set up on a test copy first.

3

Test with ZATCA

Onboarding to the simulation environment, test invoices and credit notes, rejected invoices fixed.

4

Go live

Production onboarding, live invoices confirmed with ZATCA, short handover for your team.

Who this is for

Already on Odoo Enterprise

Version 17 or later: we onboard and test your existing system.

On another system

We set up Odoo invoicing and accounting with ZATCA built in.

Starting fresh

A new Odoo setup for sales, purchase, inventory and accounting, ZATCA-ready from day one.

الربط مع منصة فاتورة (المرحلة الثانية) عبر أودو

تشمل الموجة 25 المنشآت التي تجاوزت إيراداتها الخاضعة لضريبة القيمة المضافة 187,500 ريال في أي سنة من 2022 إلى 2025، وآخر موعد للربط هو 1 فبراير 2027. نقوم بإعداد نظام أودو لديكم وربطه بمنصة فاتورة واختباره ثم الإطلاق الفعلي.

تحقق من أهليتك

Questions

Yes. Odoo's official Saudi e-invoicing for Phase 2 is part of Odoo Enterprise. The licence is paid directly to Odoo.

Someone on your side logs in to the Fatoora portal and generates a one-time code (OTP) when we are ready. We never need your portal password.

ZATCA has lowered the threshold with each wave. Setting up early avoids the rush before your deadline.

Check if you're in Wave 25

Answer two questions and we'll tell you what you need and by when.

Thanks — we'll reply within one working day.

Get ready before 1 February 2027